Proof-of-Concept Build

Construction Phase - Week 10




10-16 July 2022 


On the right is the port side aft external bulkhead # 4 (uesd in the bedroom) now pre-wired and with EPS insulation installed.

DH1-1

This is the port side forward internal bulkhead # 2 now pre-wired, with EPS insulation, internal veneer and the door that will lead to the bathroom installed.
The week ended with Natalie and Eric's wedding. Congratulations and enjoy your honeymoon!

DH1-2