Proof-of-Concept Build

Construction Phase - Week 2



24-30 July 2022 


We picked up several long lead items this week on a roadtrip to Montreal.
We got the exterior veneer for the houseboat, six 36" x 32" x 120" floats, our bathroom vanity and tub and a brand new aluminum trailer.

DH1-1

After leveling the trailer, the scaffold rails (off which the houseboat is launched) were attached to the trailer...

DH1-2

and braced

DH1-3

so that it was ready to have the 4 platform sections placed on top.
Here you see platform section #3 being set in place.

DH1-3

Then platform sections #2 and #1 followed

DH1-3

and finally platform section #4 was set in place.

DH1-3