Proof-of-Concept Build

Construction Phase - Week 2



18 to 24 September 2022 


Once the major deckhead sections were installed, holders for the eaves troughs (rainwater catchment system) needed to be added. You can see these
in the image below. Gutters fit through the little squares and then an upper branding apron is planned to block roof line visability from the side.

DH1-1

The two large windows on the left will brighten the bedroom (with anticipated sunrises and sunsets).
Mid-way down the starbord side is the galley (kitchen) window.
Furthest forward (right side of the image) the large living room window will provide wonderful views of the surrounding waterfront that we'll find ourselves in at any given time after launch.

Below you can see the rear of the houseboat, almost ready for launch after the interior is finished.

DH1-2

The front of the houseboat, prepped for a shower prior to being finished.

DH1-3