Proof-of-Concept Build

Construction Phase - Week 3



22-28 May 2022 


After the all four platform sections were finished (3 are stacked on the floor behind the workbench), it was time to start building the 8 truss sections.

DH1-1

For consistencey I made a small jig that would ensure each section was just like all the others.

DH1-2

The 'C' clamps attached to the side of the workbench were part of that jig.

DH1-3

After forming each truss section in the jig, gusset plates were added to each for added strength.

DH1-3

Each truss section is 15 feet in length. Two will be joined together to make a 30 foot truss. Four 30 foot trusses form the backbone of our houseboat and give it longitudinal strength.